FOUNDATIONS
Shallow pads with concrete slab on grade
FLOORS
Double tee, hollow core and unispan pre-stressed flooring systems
ROOF
Long run galvanised steel
EXTERNAL WALLS
The basement walls are pre-cast concrete panels. The building is predominantly clad in Hardiflex high build on steel stud together with areas of steel span 900 wall claddings
SEISMIC RATING
The valuation notes the building has a 100% NBS for the Farmers building and 91% NBS for the specialty area
NBS - New Building Standard
AIR CONDITIONING & HEATING
The specialty shops and mall entrances are air conditioned using package unit technology with main plant situated in recessed sections of the roof
VERTICAL TRANSPORT
Two OTIS passenger escalators service the basement carpark and mall retail level. Additional escalators are situated in the Farmers tenancy
FIRE PREVENTION
The complex is fully fitted with fire sprinklers, fire hose reels, smoke detectors, emergency lighting, smoke extract ventilation and smoke detectors
SECURITY
Full security including detectors both in the mall and at the entrances and comprehensive onsite guarding and monitoring services. The mall ceiling is also alarmed
AMENITIES
Male, female and handicapped toilets are provided in the centre